Oil terminal including three wharves, intended to receive
ships of 17,000 to 150,000 tons (13 m and 20 m draught),
including:
. A pier of access, 576
m, connecting the three wharves;
. The three wharves, including
each one a work of mooring, a work for berthing and
several footbridges, is: 10 pile clusters of mooring
and 11 pile clusters of accosting (monotubes of diameters
1,800 mm and 2,200 mm, with variable thicknesses); 2
technical platforms (45 m X 24 m); 10 footbridges;
bridges of access, for an overall length of 547 m;
. The technical platforms
include the equipment of transshipment, control and
fire-protection, a tower of access to the tankers, oil
collecting trays as well as a control center.
|