MARMARA EREGLISI - Liquefied natural gas import terminal

Turquie - Marmara Ereglisi

MAJ : 18/05/2010


 This is a liquefied natural gas import terminal, with import capacity of 1,100,000 tonnes/year for three storage tanks and natural gas export capacity to Turkish supply network of 685,000 normal m3/h, including :

 . A 300-m long offloading jetty with mooring facilities for LNG carriers up to 125,000 m3 capacity.
 . A platform equipped with liquid and gas loading arms.
 . Three 85,000 m3, double metallic wall tanks (9% Ni-steel and carbon steel) surrounded with a post-tensioned concrete bundwall 5 x 300 m3/h pumping system, 2 x 230,000 normal m3/h vaporizing systems, and compression unit.
 . A 24" diameter gas pipe connecting the terminal to the main gas network.
 . All control, security/safety, telecommunications and monitoring systems to operate the terminal.
 . Production and distribution of utilities.
 . Ancillary buildings (offices, workshops, housing) and associated roads.

(Acknowledgment : BOUYGUES Company - These pictures are freeware and NOT for commercial use)

      